Wausau, WI — Concrete Right Of Way Bond
Wausau's 2026 Portland Cement Concrete License Application and Bond covers construction or reconstruction of concrete in the city ROW, including sidewalks, approaches, curb/gutter and street surfaces. Its $3,000 security, one-year license and three-year work-protection provisions have different clocks.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Wisconsin
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Helps a concrete contractor arrange the City of Wausau's specific ROW license security rather than a general construction performance bond.
- Who needs it
- Contractors seeking authority to construct or reconstruct Portland cement concrete within Wausau public ROW.
- Who it protects
- The city's $3,000 form addresses actionable negligence, failure to perform properly contracts for licensed work, defective-work replacement and applicable city standards. It is tied to that licensed concrete work, not every project contract.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Wausau Engineering — Applications and Excavation Permits (opens in a new tab)Checked October 23, 2026
- Wausau — 2026 Portland Cement Concrete License Application and Bond (opens in a new tab)Checked October 23, 2026
Have these ready
- Confirm Portland cement concrete work within Wausau public ROW.
- Obtain the current packet and match contractor identity and $3,000 instrument.
- Reconcile current bond/continuation dates with license approval and work-protection provisions.
- Complete required signatures/affidavit or continuation and insurance, obtain Board approval and any project permits.
Questions about this bond
Is this simply a one-year bond?
No. The license lasts one year from approval, while the 2026 packet requires security through 2029 and the form describes three-year work protection. Confirm the actual issued dates and continuation.
What amount does the concrete form state?
The bond's penal sum is $3,000. Confirm the city's current requested packet; this option itself records no amount or period.
Does bond issuance authorize work?
No. The packet requires Board of Public Works license approval before work. Engineering lists excavation and other permissions separately.