Wisconsin — Appleton, Wisconsin Excavate In The Public Right Of Way Bond
Appleton requires $5,000 ROW permit security for excavation, with the business name matching the permit application and coverage continuing for one year after restoration. Bond issuance is separate from the approved city excavation permit and any concrete-finisher license.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Wisconsin
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Helps a City of Appleton excavation applicant prepare matching security, plans and a separate work-permit submission.
- Who needs it
- Applicants excavating or placing facilities in City of Appleton public ROW, including listed utility and surface-work activities.
- Who it protects
- The city's general bond requirements address code compliance and city loss, damage or liability from applicant negligence, malfeasance or noncompliance. The bond runs in favor of the city and must be filed with Public Works.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Appleton — Permit to Excavate in Public ROW (opens in a new tab)Checked October 23, 2026
- Appleton — General Permit Insurance and Bond Requirements (opens in a new tab)Checked October 23, 2026
- Appleton — Excavation Permit Form, March 2026 (opens in a new tab)Checked October 23, 2026
Have these ready
- Confirm City ROW, location/limits, activity and installation method.
- Obtain name-matched $5,000 city permit security and separate insurance.
- Prepare fillable application, site plan and required submission documents; check concrete license/other permits.
- File executed security, receive approved permit, coordinate start notices and confirm restoration-date-based security/release.
Questions about this bond
When does the one-year requirement run?
The excavation page says one year after restoration. Confirm the accepted date with Public Works and the issued instrument; do not count only from purchase.
Does this replace a Cement Finisher License?
No. The current city form requires a current-year Cement Finisher License for concrete work in public ROW, separately from the excavation permit and bond.
Can I start as soon as the bond is issued?
No. Wait for the approved city permit and comply with the current start-notification and traffic requirements.