Bloomington, IN — Street Closure Bond
Bloomington requires ROW permission for closures even when no digging is planned. Identify the actual street, duration and affected public spaces; the City's closure guidance does not treat adjacent sidewalks, paths, protected bike lanes and regulated parking as automatically included.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Indiana
- Bond type
- Right-of-Way / Street Work / Encroachment Bond
- Category
- Contractors & construction
What this bond does
Security required for the particular Bloomington street-closure ROW request and legal applicant.
- Who needs it
- The principal the City requires to provide closure security, coordinated with the organizer, property user or contractor responsible for the approved activity.
- Who it protects
- The accepted City instrument defines the secured closure duties. It does not grant traffic authority or guarantee every event or private construction obligation.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Bloomington Engineering: current ROW closure and submission requirements (opens in a new tab)Checked October 22, 2026
- Bloomington: Typical ROW Use Flowchart, 2024 (opens in a new tab)Checked October 22, 2026
- Bloomington: linked ROW Bond Example 1 (opens in a new tab)Checked October 22, 2026
- Bloomington: linked ROW Bond Example 2 (opens in a new tab)Checked October 22, 2026
Have these ready
- City closure request identifying street class, duration, limits and separately affected sidewalks/paths/bike lanes/parking.
- Accepted security form, legal principal/City recipient, amount/dates and confirmed Street Closure offering match.
- Responsible organizer/contractor, site and temporary traffic plans, insurance and applicable separate arrangements.
- Civic Access application, issued bond record, actual permission, reopening/clearance and release instructions.
Questions about this bond
Is a ROW permit needed if there is no excavation?
The City's FAQ says permission is required for closures, including streets, lanes and sidewalks, even without digging.
Does a street closure automatically include the sidewalk and parking?
No. The City flowchart expressly excludes adjacent sidewalks, multiuse paths, protected bike lanes and metered/residential-permit-zone parking from the street-closure category. Identify each affected space.
Does reopening the street automatically end the bond?
Do not infer that. The City-linked examples have different continuation/cancellation provisions; use the accepted issued instrument and actual release instructions.