Hancock County, IN — Open Cut Within Right-Of-Way (Non-Utility) Bond
Use this Hancock County offering for the non-utility open-cut category on a county right-of-way permit. Get the County Engineer's bond direction for the project before selecting an amount or starting excavation.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Indiana
- Bond type
- Right-of-Way / Street Work / Encroachment Bond
- Category
- Contractors & construction
What this bond does
The bond is identified with non-utility open-cut work in Hancock County road right of way. The county permit separates this activity from utility work, driveways, sidewalks and borings or pushes under county roads.
- Who needs it
- An applicant or contractor planning a non-utility open cut within Hancock County, Indiana, road right of way.
- Who it protects
- The permit contains an applicant indemnity and work-compliance obligations benefiting the county. The issued bond must state the specific security conditions; the permit's broad indemnity should not be described as unlimited surety coverage.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
Have these ready
- Confirm non-utility open cut is the County Engineer's chosen category.
- Prepare the project-location description and drawing.
- Get the required penal sum or documented waiver and accepted form.
- Obtain the complete signed permit, including page two.
Questions about this bond
Can this be used for a utility installation?
The retained title and county application distinguish non-utility open cuts from utility work. Have Engineering select the appropriate category and bond.
Is every open cut assigned the same bond amount?
The posted permit leaves the penal sum blank and also has a waiver field. Use the county's project-specific direction rather than a dollar figure from another source.
Is the permit valid with only the application page?
The form says page two with the County Engineer's signature must be attached for a valid permit. Confirm the complete approval before starting work.
Does the permit indemnity mean the surety covers every loss?
No. The applicant's permit obligations and the surety's bond liability must be read separately. Check the issued bond's conditions and limit.

