Hancock County, IN — Utility Permit Bond

Use Hancock County's Utility Work category for the actual county-road installation or maintenance request. Its permit separates utility work from non-utility open cuts and borings, leaves the bond sum for the County's direction and requires the Engineer-signed second page for valid permission.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Indiana
Bond type
Right-of-Way / Street Work / Encroachment Bond
Category
Contractors & construction

What this bond does

Security required for the particular Hancock County utility work in county-road ROW, using the County's actual bond direction.

Who needs it
The legal applicant required to provide County security, coordinated with the utility company and contractor identified in the permit request.
Who it protects
The permit contains applicant indemnity benefiting Hancock County and its officials/employees. The issued bond must define surety liability; the broad applicant indemnity is not proof of unlimited bond coverage.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Select Utility Work and describe the permit limits

The County application lists Utility Work separately from non-utility open cut and non-utility boring/pushing categories. Do not choose a non-utility instrument solely because the utility will use the same excavation method. The application separately identifies applicant and contractor and asks for the location by subdivision lot or direction/distance from an intersection, plus plans or a drawing.

Its utility provision says one permit per mile, except for subdivision streets. Ask the County Engineer how the actual alignment and subdivision exception affect the required permits and security; do not assume a single purchase authorizes every mile or automatically multiply the bond sum.

Obtain the sum or actual waiver and approved work details

The posted permit has a blank penal-sum/bond-number field and a separate waiver-category field. Obtain the County's actual required amount, accepted instrument and any approved waiver. Neither a third-party flat amount nor a State-highway blanket value establishes this county request.

The form addresses actual construction conditions: boring/pushing under county roads is measured at least 36 inches below the bottom of asphalt, while road cuts have separate flowable-backfill, concrete-cap and overnight-plating provisions. Use the approved County plans and job-specific instructions rather than treating the bond as permission to depart from them.

Complete the signed permission, not just checkout

Purchase Now opens Propeller's Utility Permit offering; the option displays no fixed amount or term. Match the legal applicant/County recipient, actual form, sum, dates and project when arranging issuance and filing.

The application says page two with the County Engineer's signature must be attached for a valid permit. It also requires permit renewal on or before expiration when continued ROW work makes renewal necessary. That is a permit obligation, not a confirmed annual bond term or automatic surety extension. Obtain actual approval and release instructions separately.

Sources

Have these ready

  1. County Utility Work classification, legal applicant/contractor and location/plans.
  2. County Engineer's permit limits, including one-per-mile provision and subdivision exception.
  3. Required bond sum/form/dates or actual approved waiver; job-specific construction/restoration conditions.
  4. Issued bond filing, complete Engineer-signed permit including page two, work/renewal and release instructions.

Questions about this bond

Can a non-utility open-cut bond be used just because the work is an open cut?

The County application separates Utility Work from non-utility open-cut and boring categories. Have Engineering identify the proper permit and accepted security for the actual utility activity.

Does one utility permit cover an unlimited distance?

The posted provision says one permit per mile, except for subdivision streets. Have the County apply that rule to the actual alignment and required security.

Does the permit expiration establish the bond term?

No. The form requires permit renewal when continued work makes it necessary, while the bond sum is separately assigned. Confirm actual bond dates and conditions rather than treating permit renewal as a surety extension.