Boston, MA — Street Obstruction / Street Opening Bond

Tell Boston Public Works whether the job occupies public space or excavates it. Its current permit instructions distinguish $5,000 occupancy security from $20,000 excavation security and link the City's bond form; those required sums are not supplied fixed amounts or terms on this option.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Massachusetts
Bond type
Right-of-Way / Street Work / Encroachment Bond
Category
Contractors & construction

What this bond does

City of Boston security for the named permit holder's duties when occupying or opening a public way under Public Works permission.

Who needs it
The actual City permittee identified in the accepted bond, with contractor and any container-owner roles correctly assigned.
Who it protects
The City's form addresses public-way duties, Commissioner directions and covered City expenses/damages arising from occupation/opening/work. It does not guarantee payment or completion of every private construction contract.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify the occupation or excavation before ordering

Boston's current instructions ask for job type, requested time, traffic/police-detail plan and actual space dimensions. Staging/fencing must address pedestrian detours; metered spaces need meter identifiers. For street-occupying storage containers, the City also calls for authorization from the container owner and that company's bond.

The City's linked form refers to the named party receiving or later receiving Public Works permission to occupy or open public ways. Confirm the accepted on-file coverage and assigned sum for the actual category; it does not establish permission for any future location or work without a permit.

File accepted proof and obtain the actual permit

Purchase Now opens Propeller; the option displays no fixed amount or term. Match the City-approved form, required permittee, sum, work coverage and dates with the issuer. Public Works asks companies missing from the online permittee/contractor lists to send the specified occupancy/excavation bond proof to its Permit Branch.

Arrange required execution and accepted filing, then complete the Public Works online application and City review. Boston asks for the permit application at least seven business days before use; that is not a promise of bond issuance speed. Finalized permission is available through the City portal.

Follow the permit's residential/metered-space posting and notice requirements, then remove debris/signs and repair or replace affected City property. Obtain the Branch's actual continuing-security and release instructions; the form continues unless its obligations are satisfied, not automatically at a supposed annual anniversary.

Sources

Have these ready

  1. Actual occupation versus excavation, permittee/contractor/container owner, location/dimensions and requested time.
  2. Assigned sum, City bond form/recipient and accepted named-party/covered-permit scope.
  3. Issuer execution and accepted Permit Branch proof, online application, traffic/pedestrian/meter and applicable plan review.
  4. Issued permit and required notices, site cleanup/City-property repair and actual continuation/release.

Questions about this bond

Are occupancy and excavation assigned the same security?

The current City guide distinguishes $5,000 occupancy from $20,000 excavation. Match the actual category with Public Works and the issuer; the option itself supplies no fixed sum/term.

Does an on-file bond authorize another street location?

The form contemplates received/future permits, but each actual occupation/opening still needs accepted City permission and coverage.

Is seven business days an issuer turnaround promise?

No. It is the City's permit-application lead-time instruction. Complete separate bond processing, accepted filing and permit review.