Skip to content

Texas bonds

Colleyville, TX — Excavation Permit Bond

Starting an excavation project in Colleyville? Apply for the permit bond using the city's written security request and your project details. Public Works construction standards help define the work; the accepted bond form determines the obligation being secured.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Texas
Bond type
Excavation Contractor Bond
Category
Contractors & construction

What this bond does

This offering is for the excavation permit security identified in your Colleyville request. Check which permit conditions the form secures; the city's technical construction notes do not by themselves establish bond terms or a citywide bonding requirement.

Who needs it
The contractor or other applicant named in a Colleyville excavation permit bond request. Use that request to identify who must sign as principal.
Who it protects
The recipient and undertaking named in the issued form define the financial security being purchased. Keep those details aligned with the written request.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Permitting and Site Coordination

Contractors must obtain a permit from the Public Works Department to cut a city street or perform work within the right-of-way. Prior to starting construction, a mandatory pre-construction meeting is held involving the general contractor, sub-contractors, the design engineer, and City of Colleyville staff.

For projects involving the state highway right-of-way, contractors are required to submit applications and plans directly to TxDOT. Additionally, contractors must verify existing underground utility locations by contacting the relevant facility owners and must provide red-lined prints to the engineer before final inspection.

Utility and Construction Standards

Construction activities must adhere to the City of Colleyville Infrastructure Construction Provisions and Details. All excavations and trenching must comply with OSHA safety regulations, and contractors are responsible for restoring disturbed areas, including driveways, sprinkler systems, and private yards, to their original condition or better.

Specific requirements exist for water and sewer improvements, including material specifications for pipe and fittings and mandatory testing procedures like vacuum testing for manholes and television inspections for sewer lines. All soil fill must be tested by an approved laboratory to ensure it meets density requirements. The paving contractor must adjust water valves in pavement to final grade within the required concrete pad. These are work standards, not evidence that every item is a condition of the bond.

Match the request, then purchase

Use the Colleyville permit's job address and work description when completing the bond application. Match the principal, recipient, security amount and dates to the written city request.

Purchase Now opens Propeller's application in a new tab. After issuance, check the completed bond against the request and follow the city's delivery instructions. Keep permit approval separate: completing the provider application does not authorize excavation or right-of-way work.

Sources

Have these ready

  1. Have the Colleyville excavation permit request and any required bond form ready.
  2. Use the applicant's legal business name and the recipient wording from that request.
  3. Find the requested security amount and effective dates in the city's instructions.
  4. Keep the job address, excavation description and Public Works project reference together.

Questions about this bond

Which document tells me what the bond secures?

Use the city's written request and accepted bond form to identify the principal, recipient and secured permit conditions. Technical construction standards describe how work is done; they do not establish the complete bond terms.

Can I use this for any excavation with a Colleyville address?

No. Colleyville's construction notes distinguish city right-of-way work from state-highway work, for which applications and plans go to TxDOT. Confirm the permit issuer for the actual excavation before assuming this offering fits.

What should I prepare before applying?

Have the city's security request, required form and amount, legal applicant, recipient wording and job reference ready. Provider review and issuance come before completing and delivering the issued bond under the city's instructions.

How do I purchase this offering?

Use Purchase Now to open Propeller's application in a new tab. Review the applicant, city request, form and required sum. Applying is separate from bond issuance, execution and city acceptance and does not grant the excavation permit.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us