El Paso, TX — Paving And Excavation Bond
El Paso's April 2026 paving-cut packet requires a current bond and insurance submission before the permit application. Gather the city's actual security request, work location and paving-cut plan to start this bond application.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Texas
- Bond type
- Excavation Contractor Bond
- Category
- Contractors & construction
What this bond does
The permit process concerns cuts or excavations in or under streets, alleys, sidewalks, parkways or driveways within the city right-of-way. Its restoration directions require original-or-better conditions under city construction standards; the packet is not a complete surety bond contract.
- Who needs it
- The applicant or contractor named in the city's bond request. The permit packet separately records contractor, subcontractor and project/private-owner information, so the party doing the work is not automatically interchangeable with every other project contact.
- Who it protects
- Keep permit security distinct from the required insurance and from traffic-control authorization. A paving-cut bond does not itself authorize a road closure, satisfy TxDOT approval or establish coverage for unrelated private-site excavation.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- El Paso — Traffic Control/Paving Cut Permit Application Packet, April 2026 (opens in a new tab)Checked October 23, 2026
Have these ready
- Have the city bond/insurance request and business-registration status.
- Confirm the legal principal, city recipient, accepted form, sum and dates.
- Identify the work location, cut/repair plan, schedule and project parties.
- Keep traffic-control, utility-locate and any TxDOT/county approvals with the permit materials.
Questions about this bond
Is traffic control included in bond issuance?
No. The city separately addresses temporary traffic-control authorization and paving-cut permission. Buying the bond does not approve either permit or outside-jurisdiction work.
Can I use the permit's duration as the bond term?
Not from this packet. It provides permit-process instructions but no complete bond term. Use the city's accepted security form and requested dates.
Where do I apply for the security?
Select Purchase Now to continue to Propeller in a new tab. Review the confirmed applicant, city recipient, form, amount and dates. Provider review and issuance do not replace execution, city filing or permit approval.