Davison, MI — Right Of Way Bond
The City of Davison's selected sewer/water/ROW/driveway application requires the contractor's $1,500 surety for right-of-way work and says to present it when obtaining the permit. Arrange the DPW inspection before backfilling; buying a bond does not authorize the excavation.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Michigan
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
City of Davison, Michigan security for the contractor's permitted right-of-way work, distinct from Township or County road requirements.
- Who needs it
- The actual contractor providing ROW security, with the owner or owner-authorized permit applicant and responsible person correctly identified.
- Who it protects
- The request concerns the identified City permit and public-way work/restoration. It is not a general construction licence or a bond for all work on the property.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- City of Davison: Applications / Permits (opens in a new tab)Checked October 22, 2026
- City of Davison: Sewer, Water, ROW and Driveway Application and Sewer Guidelines (opens in a new tab)Checked October 22, 2026
Have these ready
- City of Davison property/parcel and sewer/water/ROW/driveway permit type.
- Owner/authorized applicant, actual contractor and responsible person; complete site/plot plan.
- City-required $1,500 instrument, form/parties, actual coverage/dates and accepted filing at permit issuance.
- DPW inspection before backfill, contractor restoration and separate State trade approvals where applicable.
Questions about this bond
Who provides the ROW surety?
The City's selected guidelines require the contractor's $1,500 surety for ROW work. Identify the contractor separately from the owner or authorized permit applicant.
May the sewer repair be covered before inspection?
The selected guidelines require DPW inspection before any backfilling. Arrange it with DPW before concealing the work.
Does the one-year holding statement establish my product term?
No fixed term is displayed for this option, and the form does not specify the hold's starting/release date. Confirm the City's required coverage and release directions with the issuer and City.