East Dundee, IL — Right Of Way Bond
East Dundee's ROW application lists $25,000 surety security for the Village request. Identify whether work affects the parkway, part of the street or the full street, and coordinate any other road authority's permission.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Illinois
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Security requested for the applicant's actual East Dundee curb, street-cut, utility or other public-ROW work.
- Who needs it
- The responsible legal applicant identified in the Village's accepted ROW security request, coordinated with the owner, contractor or utility company.
- Who it protects
- The accepted instrument defines the Village's secured duties. Its application includes work/restoration and applicant-indemnity responsibilities, but these do not automatically establish every bond condition.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Village of East Dundee: ROW application and inspection checklist (opens in a new tab)Checked October 22, 2026
- Village of East Dundee: utility permit process (opens in a new tab)Checked October 22, 2026
Have these ready
- Village request, legal principal/recipient, accepted $25,000 instrument and required dates.
- Survey/work limits, activity, street area affected and completion/restoration schedule.
- Owner/contractor/utility roles, separate insurance, plans and applicable other-agency permits.
- Accepted filing, Village authorization, 24-hour inspection scheduling and actual release.
Questions about this bond
Does Village security replace a County or IDOT permit?
No. The utility instructions require applicable other-jurisdiction permissions before the Village permit can issue.
Can a homeowner assume no bond is needed?
Ask the Village how the checklist applies to the actual applicant and work. Do not treat an insurance-related exception as a confirmed waiver of the separately listed $25,000 security.
Are the same inspections needed for every activity?
No. The application lists different curb, apron, utility-improvement and repair inspections and says not every application requires each one. Arrange required inspections at least 24 hours ahead.

