Florissant, MO — Excavation Permit Bond

For contractor-performed excavation in Florissant's right-of-way, the city calls for a $2,000 license-and-permit bond or cash security and separate liability insurance on file before permitting and work. First confirm the city actually controls the ROW.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Missouri
Bond type
Excavation Contractor Bond
Category
Contractors & construction

What this bond does

This security belongs to the city's excavation-permit process, including driveway/sidewalk and other ROW work. The guide addresses finished-work quality, code compliance and protection of neighboring drainage; it is not a complete printed surety contract or a general land-disturbance bond.

Who needs it
The contractor/principal required by the city's accepted security request. The current page waives bond and insurance when the homeowner performs the work; contractor-performed work still needs the contractor's documents, even at a homeowner's property.
Who it protects
City, St. Louis County and state ROW permissions are not interchangeable. Florissant says it lacks excavation regulatory authority over county/state ROW or private property in this context. A city address alone does not settle the permit/bond path.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Do not apply cash-release timing to the surety

The current page describes a permit valid for 30 days from issuance. Separately, the guidelines say a cash-security release request cannot be made before 30 days after concrete placement. These have different starting events; neither is a stated automatic surety-bond release.

Have the work dimensions, property-line relationship and required plans/sketch ready. Engineering requires the contractor's bond and insurance on file, and work must wait for the approved permit. Obtain current surety wording, legal recipient, dates, execution and filing directions; do not substitute a cash-refund instruction for the bond contract.

Sources

Have these ready

  1. Confirm city rather than county/state ROW and identify the actual work location.
  2. Identify contractor-performed versus homeowner-performed work accurately.
  3. Have dimensions, property-line relationships and the required sketch/plan.
  4. Collect the accepted contractor security request/form, legal parties, required sum, dates and separate COI.

Questions about this bond

Does the homeowner exception apply when a contractor does the work?

The current page states the exception for work performed by the homeowner and requires contractor bond/insurance for contractor-performed work. Match the real work arrangement.

Is the 30-day cash waiting period the bond term?

No. It concerns a cash-release request after concrete placement. The separate permit's 30 days run from issuance; neither establishes complete surety cancellation/release terms.

How do I begin the surety application?

Select Purchase Now to open Propeller in a new tab. Check the contractor/principal, city-required recipient, applicable ROW request, accepted bond form, sum and dates. Provider review/issuance, execution and Engineering filing do not issue the excavation permit.