Skip to content

Oregon bonds

Forest Grove, OR — Right Of Way Permit Bond

Forest Grove's excavation guidance requires a performance bond based on Engineering's estimate of ROW construction improvements, with a $5,000 minimum. Its one-year surety period begins after the permitted work is accepted.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Oregon
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Provide security required by Forest Grove Engineering for excavation in public right-of-way or easements, including drive approaches, sidewalks and public-facility connections or construction.

Who needs it
Developers or contractors submitting an excavation/ROW permit package to Forest Grove Engineering.
Who it protects
The city's guidance ties security to improvements within the right-of-way and a year after acceptance. Match the accepted form to that obligation rather than treating it as an unrelated contractor-license bond.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify excavation and the affected improvements

Forest Grove requires an Excavation Permit for excavation in public ROW or easements. Its examples expressly include concrete drive approaches and sidewalks, and connecting to or constructing public facilities.

Describe the improvements and submit plans for Engineering review. Do not assume the bond is unnecessary because the excavation is outside the paved travel lane.

Use Engineering's estimate and acceptance date

The posted requirement is a One-Year Performance Bond equal to Engineering's estimate of the ROW construction improvements, but not less than $5,000. The minimum is not automatically the correct sum for every project.

The guidance says the one-year surety starts after the work covered by the permit is accepted. Confirm the accepted condition and required effective dates; do not substitute one year from purchase or assume the document discharges automatically.

Prepare the bond with the excavation application

Purchase Now opens Propeller's Forest Grove Right of Way Permit Bond application. Provide the legal developer/contractor, work details, Engineering's required amount and city-approved form.

The city lists plans, the bond, separate liability/property-damage insurance naming the city as additional insured, and the ROW application for submission before work begins. It allows completed applications by email to Engineering. Confirm how the issued bond itself must be delivered and obtain permit approval separately.

Sources

Have these ready

  1. Identify the developer/contractor and excavated ROW or easement.
  2. Prepare plans and obtain Engineering's estimate-based bond sum.
  3. Confirm the accepted condition and one-year-after-acceptance requirement.
  4. Prepare separate insurance and permit material and arrange bond delivery.

Questions about this bond

Is $5,000 sufficient for every excavation?

No. The city requires the estimated ROW improvement amount, as determined by Engineering, with $5,000 as a minimum.

When does the posted one-year surety period start?

After the work covered by the permit is accepted. Confirm the acceptance and bond documentation with Engineering.

Does the bond supply the required liability insurance?

No. Forest Grove lists the bond and insurance evidence separately in the excavation application requirements.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us