Fox Metro Water Reclamation District, IL — Right Of Way Permit Bond
Fox Metro's Engineering page requires a $25,000 license and permit bond describing the work as “Sanitary Sewer Construction.” Confirm that this Right of Way Permit offering can produce the District's required instrument before applying; a street-work label alone does not establish a match.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Illinois
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Security for the actual Fox Metro sewer-work obligation, subject to confirmation that the offered instrument meets the District's request.
- Who needs it
- The firm or contractor required to file District sewer-work security, coordinated with the developer or other permit applicant.
- Who it protects
- The accepted District instrument controls the secured duties. Fox Metro sewer security is not automatically the same as a municipality's street-opening bond or a guarantee of the entire development.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
Have these ready
- Actual District request and confirmation that this offering can meet the license/permit instrument and exact “Sanitary Sewer Construction” description.
- Legal contractor/principal, District recipient, $25,000 requirement, dates and accepted filing.
- Developer/permit-applicant roles, building or street-sewer plans and Engineering approval.
- Bond/license filing before permit/work, construction inspections, testing and actual release instructions.
Questions about this bond
Can the work description just say Right of Way?
Fox Metro's Engineering page requires “Sanitary Sewer Construction” and says other descriptions must be modified. Confirm the offered instrument can meet that request before applying.
Is this automatically the same as a City street-opening bond?
No. The published requirement names Fox Metro Water Reclamation District and sewer work. Any road-owner permission and security must be matched to their own actual requests.
Does completing construction authorize sewer use or release the bond?
The District requires testing before new sewers can be used, followed by television inspection. Its posted process does not establish an automatic bond release when construction ends.

