Hazel Crest, IL — Street And Sidewalk Permit Bond
Before using this Hazel Crest offering, obtain the Village's current street-and-sidewalk bond request for the work you will perform. A resident sidewalk-replacement application is not the contractor's bond form or proof of the security required for a street permit.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Illinois
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Security requested for the particular Hazel Crest street or sidewalk work, subject to confirmation of the current instrument and permit conditions.
- Who needs it
- The legal applicant named in the Village's actual security request, which may differ from the owner or tenant asking the Village to inspect a sidewalk.
- Who it protects
- The accepted Village instrument must define the protected work and secured duties. Do not substitute an unrelated building-security amount or a guarantee of the entire private project.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Village of Hazel Crest: Public Works responsibilities and documents (opens in a new tab)Checked October 22, 2026
- Village of Hazel Crest: posted sidewalk-replacement application (opens in a new tab)Checked October 22, 2026
Have these ready
- Current Village or other road-authority request identifying street/sidewalk location and work.
- Accepted bond form, required legal applicant/recipient, amount, dates and provider match.
- Owner/tenant replacement-request role versus contractor/permit-applicant role.
- Current filing instructions, permit authorization, work/inspection arrangements and actual release conditions.
Questions about this bond
Is the sidewalk-replacement application the required bond form?
No. It describes a walk for Village inspection and replacement priority and assigns certain repair responsibilities to the signer. Obtain the separate current street-and-sidewalk security request.
Must the resident who requested replacement buy this bond?
The replacement form does not establish that requirement or the bond principal. Have the Village identify the party required to provide security for the actual permitted work.
Can I assume every Hazel Crest road is Village-controlled?
No. Public Works describes responsibility for most public streets and sidewalks. Confirm the authority for the actual work location before choosing a recipient or permit.

