Hobart, IN — ROW Permit Bond
Hobart's posted ROW application distinguishes longitudinal and lateral cuts or borings, separates applicant and contractor, and leaves the required bond sum to City staff. Its stated $500 minimum is not automatically the amount assigned to your project.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Indiana
- Bond type
- Right-of-Way / Street Work / Encroachment Bond
- Category
- Contractors & construction
What this bond does
Security required for the actual Hobart street, curb, sidewalk, alley, bridge or other ROW cutting/excavation request.
- Who needs it
- The legal applicant required to provide Hobart ROW security, coordinated with the contractor separately identified in the Engineering application.
- Who it protects
- The accepted bond defines the City's secured ROW duties. The permit's restoration-estimate field does not establish a guarantee of every private construction obligation or an unlimited surety indemnity.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Hobart Engineering: posted ROW cutting/excavation application (opens in a new tab)Checked October 22, 2026
- Hobart Engineering: current Permit Applications and OpenGov route (opens in a new tab)Checked October 22, 2026
Have these ready
- Engineering request identifying the Hobart work location, cut/bore classification and applicant/contractor.
- Actual City-assigned sum, legal principal/City recipient, accepted form and dates.
- Excavation dimensions, schedule and construction/restoration estimate, with required plans or other documents.
- Current OpenGov permit application, separate Clerk-Treasurer bond filing, actual approval and release instructions.
Questions about this bond
Is the bond automatically $500?
The posted ROW application cites a $500 minimum but leaves the actual required bond amount for City staff. Obtain Engineering's current project-specific sum and accepted instrument rather than assuming the minimum is the assigned amount.
Where does the City currently accept Engineering permit requests?
The current Engineering Permit Applications page directs requests through OpenGov, which replaces traditional application paperwork. Its permit profile is not merely the City's website account for notifications.
Does an OpenGov submission prove the bond is filed?
Do not assume that. The posted ROW form says the bond must be filed with the Clerk-Treasurer before work. Confirm current delivery with Engineering and that office separately from online application submission and actual permit approval.