Skip to content

Missouri bonds

Kansas City, MO — Right Of Way Performance And Maintenance For Parks & Recreation Dept. Bond

Use the Kansas City Parks & Recreation request for work in its jurisdiction, not a general street-work or park-event assumption. Identify the park, boulevard or parkway and the proposed construction or occupation. The Parks permit page distinguishes events from encroachment licensing, but it does not establish this bond's accepted form or maintenance term.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Missouri
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Prepare the particular Kansas City, Missouri Parks-related ROW performance/maintenance undertaking identified in the actual written request.

Who needs it
The legal principal responding to Parks & Recreation's work/security request, with the property owner, developer and working contractor roles identified.
Who it protects
The accepted Parks-requested instrument defines the performance, restoration and maintenance obligations. A park reservation, event permit or sidewalk-cafe encroachment licence is not evidence that every construction activity is bonded on the same terms.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify Parks property and the actual activity

Provide the precise park or boulevard/parkway segment, proposed installation, excavation or temporary occupation, disturbed area and responsible parties. Have Parks identify the permission and security required for that operation.

The actual Parks page describes Board-controlled park uses and separately discusses sidewalk-cafe leases and encroachment licences along the boulevard/parkway system. It does not publish this catalog offering's bond instrument.

Do not use event-processing deadlines as construction-bond deadlines. Likewise, a general Public Works ROW application or park-event reservation does not establish acceptance of this Parks-specific undertaking.

Match the Parks request and issued document

Obtain the accepted form, named recipient, legal principal, covered site/work, assigned sum and effective dates. Confirm any maintenance period, insurance and executed-bond delivery instructions; none is established by the general event/encroachment context.

Purchase Now opens this Parks offering's existing Propeller option, with no fixed amount or term supplied. Keep it distinct from the separately cataloged general Kansas City ROW offering and match the actual Parks request with the issuer.

Arrange execution and accepted filing, then obtain the actual work permission and any other required City approvals. Follow the applicable traffic/access, inspection and landscape/pavement restoration conditions and obtain the requesting office's security-release directions; leaving the site does not itself establish release.

Sources

Have these ready

  1. Parks-requested work, precise park/boulevard/parkway location and disturbed/occupied area.
  2. Legal principal and actual owner/developer/contractor roles.
  3. Accepted Parks instrument/recipient, assigned sum/dates and actual maintenance/insurance request.
  4. Issuer execution/filing, actual work approvals and inspection/restoration/release directions.

Questions about this bond

Is a park-event reservation the ROW work approval?

No. Identify the actual construction or occupation and obtain the Parks permission and security required for it.

Are event lead times the bond's deadline or term?

No. The event page does not establish construction-bond dates. Use the actual Parks work/security request.

Is this automatically the general Kansas City ROW bond?

No. This record is Parks-specific and has its own provider destination. Match the department and accepted instrument before issuance.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us