What this bond does

City of Leslie, Michigan security for the permitted work and restoration to City specifications, with the City able to complete unfinished work and charge the applicant as the form provides.

Who needs it
The owner or contractor applying for City ROW work. When an owner hires a contractor, the form makes that contractor responsible for the permit provisions; confirm the actual security principal separately.
Who it protects
The City receives security for the stated permit duties and restoration. Its form accepts a licence/permit bond or cashier's check/cash in lieu; it does not describe surety as secondary security.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Match security to the ROW work estimate

The form requires 150% of construction cost, with at least $5,000 security, and an owner-authorized quote or estimate for the work within the ROW. Use that work record to confirm the City's assigned basis rather than automatically using the full private development budget.

The selected form accepts a licence/permit bond or cashier's check/cash in lieu. Have the City confirm the actual principal/recipient, accepted form, amount and security dates. The proposed start/end and permit-expiry fields do not establish a supplied bond term.

Complete the application and obtain City approval

Identify the work address, owner, applicant/contractor, proposed dates and scope. Include the required sketch showing the location, work and traffic control and a separate liability certificate listing the City as certificate holder. Do not substitute additional-insured wording for the form's actual request.

The completed application becomes the official ROW permit only if approved. If the owner hires a contractor, that contractor assumes the permit requirements; confirm the security principal rather than treating the applicant and contractor fields as interchangeable.

Arrange issuance, inspection and restoration

Purchase Now opens Propeller. The option displays no fixed amount or term. Match the confirmed City instrument and parties with the issuer, arrange execution and accepted filing, and obtain the approved permit before starting.

Follow the form's MISS DIG instruction and call for a form inspection at least 24 hours before pouring concrete. Restore the ROW to its prior or better condition under City specifications within the permitted period.

Keep inspection, completion and restoration records and ask for the actual security-release instructions. The form allows the City to finish incomplete work and charge the applicant; it does not establish automatic release or a premium refund when the work period ends.

Sources

Have these ready

  1. Owner-authorized quote or cost estimate for the work within the City's ROW.
  2. City-confirmed 150% construction-cost security, minimum $5,000, with actual form/parties and dates.
  3. Obtain a certificate of liability insurance with the City of Leslie listed as the certificate holder.
  4. Prepare a detailed site sketch showing the proposed work area and traffic control plan.
  5. Accepted execution/filing and actual permit approval, MISS DIG coordination, 24-hour advance form inspection before concrete and closeout/release instructions.

Questions about this bond

What is the minimum bond amount required by the City of Leslie?

The form requires 150 percent of construction cost, at least $5,000, and an owner-authorized quote or cost estimate for the ROW work. Confirm the City's assignment rather than treating the entire private project's budget as the security basis.

Can I provide a cash deposit instead of a surety bond?

Yes, the city accepts a cashier's check or cash in lieu of a License and Permit Bond to satisfy the security requirement.

Is insurance required in addition to the permit bond?

Yes. The selected form requires a liability certificate with the City as certificate holder and references Section26-18. That certificate is separate from the permit security.

Who is responsible for the permit if a contractor is hired?

If an owner hires a contractor to perform the work, the contractor assumes full responsibility for all permit provisions and requirements.