Marlborough's linked 2025 rules distinguish the street-opening/performance bond from the utility-layer bond. They state $5,000 for street-opening security, with a higher amount possible for large projects. Confirm which City bond and maintenance language your work requires before applying.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Massachusetts
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

City of Marlborough, Massachusetts street-opening/performance security for the assigned public-way work and related restoration obligations.

Who needs it
The qualified contractor opening, occupying or obstructing the City public way, with any separately required utility-layer qualification identified.
Who it protects
The accepted street-opening instrument concerns the specified City work and restoration/maintenance. It is not the same instrument as every utility-layer bond or a guarantee of the whole private construction contract.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Match the City's street-opening instrument

The City's current licensing/permitting page links its 2025 Rules and Regulations. Those rules separate contractor qualification from permission for the actual site and work dates. A licence does not itself authorize opening, occupying or obstructing a public way.

The bond section separately describes utility-layer and street-opening/performance bonds. The street-opening provision states $5,000 or a greater City-required amount for larger projects. Have the City identify which instrument or instruments apply and whether an express agency/utility exception applies; an exception to posting security is not a blanket permit exemption.

Check maintenance language, notices and acceptance

Purchase Now opens Propeller; the option displays no fixed amount or term. The City rules describe one- or three-year bond forms with three-year maintenance provisions for each year covered. Confirm the required form, City recipient/principal, amount, coverage and dates with the City and issuer; the rules' alternatives are not stated term choices for this option.

The maintenance period begins with City acceptance of the work. Release is subject to the stated review and approval, not simply the contractor licence's December 31 expiry or the date a patch was laid. Keep acceptance, inspection and any required correction records.

Arrange execution and City-accepted filing and obtain the actual OpenGov permit. The rules describe permit lead time, advance work/inspection notices and separate City utility markouts because the City is not a Dig Safe member. Follow both the required Dig Safe process and City coordination; neither a bond purchase nor one locate request supplies all permission to excavate.

Sources

Have these ready

  1. Actual City public-way site, work plan/scope, qualified contractor and any separate utility-layer requirement.
  2. City-selected street-opening form, recipient/principal, assigned sum and any expressly applicable exception.
  3. Required one-/three-year form and maintenance language, actual coverage/dates and issuer execution/City filing.
  4. OpenGov work permit, required traffic/pedestrian plans, start/inspection/markout notices and City acceptance/release records.

Questions about this bond

Is the utility-layer bond the same as the street-opening bond?

The City's rules describe them separately. Have the City identify the actual security required for your licensed activity and public-way work.

Can I choose a supplied one- or three-year term here?

The option displays no fixed term. The City's published bond-form alternatives and maintenance language must be matched with the issuer; they are not stated offer attributes.

Does the maintenance clock start when I buy the bond?

The rules start the maintenance period with City acceptance of the work. Obtain the actual acceptance and release directions; purchase, licence expiry and work completion are different events.