Medway, MA — Right Of Way Bond
Medway's ROW licence requirements list a $5,000 performance bond for work on Town property and infrastructure covered by that licence. The current DPW page says an approved drainlayer does not need a separate ROW licence. Confirm the applicable qualification and obtain the actual street or utility work permission.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Massachusetts
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Town of Medway, Massachusetts performance security for its applicable ROW licence and assigned public-way obligations.
- Who needs it
- The person or business required to hold Medway's ROW licence, distinguishing an already approved drainlayer and any separately permitted utility work.
- Who it protects
- The accepted security concerns the Town work and restoration obligations covered by the assigned licence/instrument. It does not replace the particular street-opening or utility permit.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Medway: current Public Works permitting instructions (opens in a new tab)Checked October 22, 2026
- Medway: actual linked ROW Licence Requirements (opens in a new tab)Checked October 22, 2026
- Medway: current linked Street Standards, April2022 revision filename (opens in a new tab)Checked October 22, 2026
Have these ready
- Actual Town property/ROW/utility-easement work and whether an approved drainlayer qualification already applies.
- Required licence holder/principal, Town recipient and accepted performance-bond form, amount, coverage and dates.
- Actual Citizenserve street/utility application rather than the licence-requirements download, with any separate required permission.
- Issuer execution/DPW filing, Town and Dig Safe coordination, completion notice and permanent-repair inspection records.
Questions about this bond
Does an approved drainlayer need a separate ROW licence?
The current DPW page says no. Confirm the applicable qualification and street/utility permits; that exception is not permission to skip the actual work application or other assigned security.
Is the Street Opening Permit download an issued permit?
The current linked download is a ROW licence-requirements sheet. Obtain the actual Town permission through its application process and confirm the security filing method.
Does an annual licence mean this bond has a one-year term?
The option states no fixed term. The licence cycle, excavation warranty and issued bond coverage must be checked separately with DPW and the issuer.