Metropolitan Water Reclamation District Of Greater Chicago, IL — Right Of Way Permit Bond
Identify the MWRD property interest and permit behind the request before using this ROW offering. District land-use permission, watershed/sewer review and a City street permit are different matters; the District's name does not make the City of Chicago the bond recipient.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Illinois
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Security for the actual Metropolitan Water Reclamation District of Greater Chicago ROW permit obligation, once the accepted instrument is confirmed.
- Who needs it
- The legal permittee or other party the District names in its security request, coordinated with the property user and performing contractor.
- Who it protects
- The accepted District instrument defines the secured duties. Do not import private-lease remediation provisions or watershed-permit conditions as the terms of an unspecified ROW bond.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- MWRD: posted Comprehensive Land Use Policy (opens in a new tab)Checked October 22, 2026
- MWRD Engineering: watershed/sewer permit determinations (opens in a new tab)Checked October 22, 2026
Have these ready
- District request identifying property/ROW interest, parcel, proposed work and responsible permit program.
- Accepted security form, legal principal/full District recipient, amount/dates and confirmed offering match.
- Property-user/contractor roles and applicable plans or separate permit-determination material.
- Correct District receiving office, issuance and filing, actual permissions, inspections and release instructions.
Questions about this bond
Should the recipient simply be the City of Chicago?
Do not substitute the City for the Metropolitan Water Reclamation District of Greater Chicago. Use the legal recipient and instrument in the actual District request.
Are lease-remediation security and a ROW permit bond interchangeable?
The posted land-use policy addresses different agreements and places environmental restoration security in its private-lease provisions. That does not prove the form or amount for this ROW offering.
Does a watershed permit determination complete ROW bond filing?
No. The determination process addresses permit applicability. Obtain the actual land/ROW permission and security instructions and arrange the required bond issuance and filing separately.

