Midland, MI — Right Of Way Bond

Midland's City Engineering form identifies a $3,000 street-cut/ROW bond deposit, separate general ROW activities and owner/contractor information. Confirm whether the City accepts this offered surety instead of the stated deposit before purchase; new utility mains have a different application route.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Michigan
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

City of Midland, Michigan security expressly accepted for the actual street-cut or other ROW request; exact surety/deposit equivalence remains factual-check-pending.

Who needs it
The actual owner/applicant and contractor for the job address, with street-cut, approach/curb/sidewalk, sewer-connection or new-main scope identified.
Who it protects
The accepted security concerns the particular City work and satisfactory repair/completion conditions. A refundable City deposit is not a promised surety-premium refund.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify street-cut, general ROW or new-main work

The City's Engineering page defines the public ROW to include street, sidewalk and outlawn. Its general form covers approach modifications, curb cuts, sidewalk work, street cuts and sewer connections. The page separately identifies a utility permit for new main lines, with stated exceptions, and separate moving/stormwater resources.

The actual online general form asks for job address, owner and contractor, activity description and uploads. Its street-cut section marks the $3,000 deposit refundable after satisfactory street repair or work completion. It does not establish that this offered surety replaces cash/deposit, a universal security for all activities or the accepted surety language.

For sanitary sewer work, the online form requires the lateral agreement before the City issues its invoice and states the owner's continuing lateral responsibility. Submitting the form does not certify the private lateral's condition or issue permission by itself.

Confirm the accepted instrument before arranging issuance

Ask Engineering whether the actual request requires deposit or accepts surety, the correct application category, recipient/principal, assigned sum, coverage/dates, execution and filing. Do not import Midland County Road Commission conditions or the City's unrelated construction-contract bonds.

Purchase Now opens Propeller. The option displays no fixed amount or term. If the City accepts this instrument, match it with the issuer, arrange execution and accepted delivery, and obtain the approved permit before work.

The online form has a 50-day noncommencement or suspension/abandonment condition. That is not a supplied 50-day bond term. Follow the actual inspection/restoration instructions and keep the City's satisfactory-completion and security-release record separately from any deposit refund.

Sources

Have these ready

  1. City job address, owner/applicant, actual contractor and activity description.
  2. Engineering-confirmed general/street-cut versus new-main or other permit route.
  3. Accepted deposit/surety arrangement, form/parties, sum and coverage/dates.
  4. Applicable lateral agreement, actual issuance/filing/permit, inspection/restoration and release/refund records.

Questions about this bond

Does the $3,000 deposit prove this surety is accepted?

No. The actual form identifies a street-cut/ROW deposit. Have Engineering confirm the instrument it accepts for your work before treating this option as a substitute.

Can a new utility main simply use the general form?

The Engineering page identifies a separate utility-permit route and specific exceptions for new mainline work. Confirm the actual classification rather than assuming a general street-cut request covers it.

Is the 50-day permit condition the bond term?

No. It concerns noncommencement or suspended/abandoned work. The offered option displays no fixed term; confirm security dates and release separately.