Midland, MI — Right Of Way Bond
Midland's City Engineering form identifies a $3,000 street-cut/ROW bond deposit, separate general ROW activities and owner/contractor information. Confirm whether the City accepts this offered surety instead of the stated deposit before purchase; new utility mains have a different application route.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Michigan
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
City of Midland, Michigan security expressly accepted for the actual street-cut or other ROW request; exact surety/deposit equivalence remains factual-check-pending.
- Who needs it
- The actual owner/applicant and contractor for the job address, with street-cut, approach/curb/sidewalk, sewer-connection or new-main scope identified.
- Who it protects
- The accepted security concerns the particular City work and satisfactory repair/completion conditions. A refundable City deposit is not a promised surety-premium refund.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- City of Midland Engineering: Permits (opens in a new tab)Checked October 22, 2026
- City of Midland: actual online ROW Application (opens in a new tab)Checked October 22, 2026
Have these ready
- City job address, owner/applicant, actual contractor and activity description.
- Engineering-confirmed general/street-cut versus new-main or other permit route.
- Accepted deposit/surety arrangement, form/parties, sum and coverage/dates.
- Applicable lateral agreement, actual issuance/filing/permit, inspection/restoration and release/refund records.
Questions about this bond
Does the $3,000 deposit prove this surety is accepted?
No. The actual form identifies a street-cut/ROW deposit. Have Engineering confirm the instrument it accepts for your work before treating this option as a substitute.
Can a new utility main simply use the general form?
The Engineering page identifies a separate utility-permit route and specific exceptions for new mainline work. Confirm the actual classification rather than assuming a general street-cut request covers it.
Is the 50-day permit condition the bond term?
No. It concerns noncommencement or suspended/abandoned work. The offered option displays no fixed term; confirm security dates and release separately.