Mount Vernon, WA — Right Of Way Bond

For construction in Mount Vernon's right-of-way, submit the permit application before ordering security to an assumed amount. The city's construction handout says Engineering determines the amount and staff supplies the surety paperwork and instructions after application.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Washington
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Helps a Mount Vernon ROW applicant obtain the city's actual security request before using this bond offering.

Who needs it
Applicants, contractors and utility companies arranging city ROW construction such as access, driveway or utility connection work.
Who it protects
The city-issued instrument defines the obligation to Mount Vernon. A generic ROW offering does not establish whether the city wants construction performance or a later warranty undertaking.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Start with the construction application

The construction handout covers work including sidewalk and driveway repairs, access construction and utility installations or connections. It directs applications through the city's SmartGov portal, with site and traffic-control plans and separate insurance documentation.

Identify the adjacent parcel, exact work area, existing utilities, proposed trench restoration and applicant's legal name. A bond application is not the city's ROW permit.

Get the amount and form from Engineering

For ROW construction, the handout calls for a surety bond or cash deposit in an amount determined by the Engineering Services Manager. City staff provides the paperwork and instructions after the permit application is submitted.

The separate financial-security guide distinguishes limited performance-security arrangements from warranties on completed infrastructure. Its infrastructure percentages are not a universal calculation for every ROW permit. Have staff select the actual form, amount and required period for this work.

Match the provider application to the city paperwork

This page offers one Propeller ROW bond application. The exact city-issued instrument and its match to that offering remain factual-check-pending. Supply the provider with the city's paperwork rather than substituting a general contractor bond or an infrastructure warranty form.

After issuance, submit the executed security as staff directs and obtain the necessary permit authorization before work. Ask the city how inspections, acceptance and eventual release apply to the selected instrument.

Sources

Have these ready

  1. Submit the city ROW construction application with the location, work scope and required plans.
  2. Obtain Engineering's amount and staff-issued security paperwork.
  3. Confirm performance versus warranty, required dates and the provider's form match.
  4. Arrange city acceptance, permit authorization and the applicable inspection/release process.

Questions about this bond

Can I order a standard amount before applying?

The city's ROW construction handout leaves the amount to the Engineering Services Manager and says staff supplies security paperwork after application. Get that request first.

Does every ROW bond use the infrastructure performance percentage?

No universal percentage is stated in the ROW construction handout. The broader financial-security guide covers distinct infrastructure performance and warranty stages; ask staff which applies.

Will Mount Vernon accept any provider form?

The financial-security guide says Development Services supplies forms and other forms require City Attorney preapproval. Confirm the actual instrument before issuance.

Does buying the bond authorize work?

No. Provider issuance, city acceptance of security and the city permit are separate steps.