New York, NY — Street Obstruction (2-50 Locations) Bond
If NYC DOT requires its two-to-fifty-location permit-bond category, the currently linked form states $50,000. Confirm your street-obstruction work belongs in that category before applying; DOT's $25,000 multiple-location building-operations form is a separate instrument.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- New York
- Bond type
- Right-of-Way / Street Work / Encroachment Bond
- Category
- Contractors & construction
What this bond does
Arrange the City's requested multiple-location permit security for the principal's approved operations. Location count and work classification both matter; this listing does not combine all City permit categories into one blanket approval.
- Who needs it
- A permittee planning work at two to fifty locations under a DOT request for that form. Obtain the expected location count and activity descriptions for the coverage period and confirm any change in category before adding sites.
- Who it protects
- The official form secures permitted-work compliance, completion or repair, restoration of City property, and stated City costs and liabilities. It does not issue permits for the listed locations or replace separate insurance.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- NYC DOT current two-to-fifty-location liability permit bond (opens in a new tab)Checked October 23, 2026
- NYC DOT general conditions and current template categories (opens in a new tab)Checked October 23, 2026
- NYC DOT multiple-location building-operations-only form (opens in a new tab)Checked October 23, 2026
Have these ready
- List the anticipated sites and actual activities during the requested coverage period.
- Have DOT confirm the two-to-fifty category rather than building-operations-only or a higher location band.
- Prepare the principal, $50,000 form, dates, coverage year and execution attachments.
- Arrange separate permit/insurance submissions, continuation instructions and post-work guarantee requirements.
Questions about this bond
Is the $25,000 building-operations bond interchangeable with this category?
No. The currently selected two-to-fifty-location template states $50,000, while the $25,000 form is labeled for building-operations permits only. Have DOT confirm your work classification.
Can the same category cover a fifty-first location?
Do not assume so. DOT publishes a separate 51-to-100-location template. Confirm how DOT counts your sites and what security it requires before expanding the work.
Does cancellation release the earlier permitted work?
The form says cancellation is not effective for permits issued or work performed before its effective date. Earlier-work and maintenance obligations can remain, so obtain the applicable continuation and completion instructions.

