Oak Park, MI — Right Of Way Permit Bond
Oak Park's published ROW application lets the City Engineer require accepted performance or cash security, with an assigned sum of at least $1,000 and a period of at least one year from application. Keep that requirement separate from the inspection-cost deposit and the actual product term supplied by the issuer.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Michigan
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
This bond protects the City of Oak Park against potential financial losses or damages resulting from construction operations within the public right-of-way. It holds the permit holder accountable for fulfilling the conditions outlined in their approved permit application, including site restoration and damage prevention.
- Who needs it
- The actual City ROW applicant and contractor instructed to supply security. The selected form makes a contractor performing the work and supplying the bond responsible along with the applicant for applicable provisions.
- Who it protects
- The bond acts as a surety for the City of Oak Park, Michigan. It is a performance-based obligation ensuring the applicant complies with all permit conditions, including the duty to save the city harmless from claims for damages and to perform necessary site work, removals, or alterations as requested by the City Engineer.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- City of Oak Park Application for Right-of-Way Permit (opens in a new tab)Checked October 18, 2026
Have these ready
- Verify the exact bond amount required for your specific project with the Oak Park City Engineer.
- Obtain a performance bond from a licensed surety provider that meets the city's requirements.
- Confirm requested liability evidence and current amounts separately from performance/cash security.
- Ensure your Application for Right-of-Way Permit is completed and signed by all relevant parties.
- Confirm if a separate cash deposit is required by the City Engineer for inspection costs.
Questions about this bond
What is the minimum amount for the Oak Park Right of Way Permit Bond?
The bond must be in an amount determined by the City Engineer, but it cannot be less than $1,000.00.
How long must the bond remain in effect?
The bond must remain in effect for a period of not less than one year from the date of your permit application.
Is this bond the same as the cash deposit?
The form distinguishes accepted performance or cash security from the separate inspection/expense deposit of at least $300. Confirm both assignments; the expense-deposit return is not a surety-premium refund.
What happens if I fail to follow the permit conditions?
If you fail to comply with permit conditions or refuse to remove/alter facilities as requested, the city may use the bond to cover the costs incurred to address the situation.