Skip to content

Illinois bonds

Peoria, IL — Right Of Way Bond

Peoria distinguishes contractors disturbing the ROW surface from owners doing their own adjacent-property work. Its contractor permit application gives the owner-work bond a $10,000 amount; do not automatically use that figure or form for every contractor or general encroachment.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Illinois
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Security required for the actual Peoria applicant and ROW activity, once the applicable owner or contractor instrument is confirmed.

Who needs it
The contractor or property owner identified in the City's actual security request, with the role confirmed before selecting this offering.
Who it protects
The application's owner-work provision indemnifies the City against accidents or damages caused by negligence in performing, executing or protecting permitted work. Obtain the actual contractor instrument rather than assuming identical coverage.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Match the bond to who will perform the work

The City's Contractor ROW Permit Application says contractors disturbing the ROW surface must have a current City license and bond; Accounts Receivable handles proof of bond. Separately, its owner-work provision requires an owner doing work adjacent to their own property to execute a $10,000 City bond approved by Corporation Counsel. That paragraph does not establish the contractor bond's amount or waive the owner's other applicable requirements.

The application identifies sidewalk, curb, drive approach and other excavation, pavement/outside-pavement dimensions, work dates and street/sidewalk closure arrangements. Use the actual performer and project details when asking the City and issuer which accepted instrument applies.

Separate general encroachment permission and work permits

Peoria's general ROW-use guidance also addresses encroachments such as culverts, retaining walls, landscaping and sprinkler systems. That permit is an agreement to maintain the encroachment and remove it at no City cost when required for good cause. It does not establish that every such use requires this same bond. Surface work and closures follow their actual permit and traffic-control requests.

Purchase Now opens Propeller; the option displays no fixed amount or term. Obtain the City request, required legal principal/recipient, form, amount, dates and confirmed owner/contractor match before applying. Check issuance and proof-of-bond filing separately from Public Works permit approval and validation, inspections and restoration.

Sources

Have these ready

  1. City request identifying contractor surface work, owner-performed adjacent work or another encroachment.
  2. Accepted instrument, legal principal/City recipient, amount/dates and confirmed offering fit.
  3. Actual work dimensions, dates, location sketch and applicable pedestrian/traffic-control plans.
  4. Role-specific proof-of-bond filing, Public Works authorization/validation, inspections and actual release conditions.

Questions about this bond

Is the contractor bond automatically $10,000?

The posted application expressly gives that amount for owner-performed work adjacent to the owner's property. Contractors disturbing the surface must have a current City license and bond, but that paragraph does not establish their bond amount or form.

Does a general encroachment agreement prove this bond is required?

No. The general-use guidance addresses maintenance and possible removal of an encroachment. Have Public Works identify the applicable activity and actual security request.

Does proof of bond complete the work permit?

No. The application distinguishes bond records from work/closure approval and permit validation. Follow the actual City instructions for each step.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us