Perinton, NY — Street Obstruction Bond
Ask Perinton which permit and security request this Street Obstruction Bond must satisfy. The Town's selected highway form addresses drainage, sewer and water-pipe work under Section 149, but it does not state the amount or accepted instrument for this offered surety.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- New York
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Match the bond to a defined Town highway obligation, not to a general development or road-maintenance guarantee. An obstruction request involving materials or another activity may need different instructions from the selected pipe-work permit.
- Who needs it
- An owner, contractor or utility with a written Perinton street-obstruction security request. Identify the affected highway, activity and requesting office before relying on the product title.
- Who it protects
- The selected highway permit addresses restoration, protection of travel and drainage, and maintenance or repair of installed appurtenances. It does not verify this offering's surety scope, amount or duration.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Town of Perinton selected Section 149 highway-work application and permit (opens in a new tab)Checked October 23, 2026
Have these ready
- Obtain the actual Perinton obstruction request and identify the highway authority.
- Describe the activity, site, applicant and any installed facilities.
- Confirm the operative permit, accepted bond form, amount, principal and dates.
- Arrange provider issuance, executed filing, work approvals, utility coordination and release instructions.
Questions about this bond
Does the posted highway form cover every street obstruction?
It describes drainage, sewer and water-pipe work. Ask the Town whether it applies to the actual obstruction or whether a different permit and security form are required.
Is a development road-maintenance bond the same obligation?
Do not assume so. This offering must match the actual street-obstruction request, not an unrelated development guarantee.
Do the 2025 date blanks establish an annual surety term?
No. They identify the posted permit form, not this bond's verified duration. Obtain the operative permit and accepted security dates from the Town.

