Snohomish County, WA — Drainage And Right Of Way Utility Performance Bond

This Snohomish County offering combines drainage and ROW utility performance in its name. Have PDS identify the actual project security and whether one instrument covers both obligations before applying; the county's separate erosion, drainage warranty and maintenance securities are not interchangeable.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Washington
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Helps a county utility-development applicant resolve the combined drainage/ROW performance label against the actual PDS request.

Who needs it
Applicants arranging security for Snohomish County utility construction with associated drainage or restoration requirements.
Who it protects
The accepted county instrument defines the work and undertaking. The combined offering's current form and coverage match remain factual-check-pending.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify both utility and drainage work

The county's ROW page describes PDS review under the applicable public-road and development ordinances, with security potentially required before permit issuance for construction, restoration and installed-facility performance.

Describe the county road, utility work, approved plans and drainage measures. Ask whether the request is for a combined instrument or distinct securities; a project involving both subjects does not establish that one bond covers everything.

Keep drainage security stages distinct

The county's security page distinguishes erosion-control security, drainage warranty and drainage maintenance, with different triggers and calculations. Those published stages should not be assigned to this combined performance offering solely because its title includes drainage.

Obtain the current required form, legal principal, recipients, approved amount and dates. The exact combined instrument and its equivalence to this Propeller offering remain pending; do not substitute the separately listed ROW Utility offering without confirmation.

Resolve the permit review before ordering

The county's D8 utility process calls for online application, construction plans, SWPPP and applicable pre-design/deviation approvals. Its utility checklist separately addresses drainage, critical areas and other reviews; completeness review is not permit authorization.

Once PDS and the provider confirm the actual security, use the existing Purchase Now option and submit the executed document as directed. Obtain permit approval and the applicable inspections, acceptance and release instructions. A drainage-stage deadline or pavement-cut restriction is not automatically the bond term.

Sources

Have these ready

  1. Identify the county-road utility project and drainage/restoration work.
  2. Ask PDS whether combined or separate security instruments are required.
  3. Obtain approved forms, work estimates, parties and dates; confirm the provider match.
  4. Complete applicable D8 review, security filing, permit approval and acceptance/release steps.

Questions about this bond

Does the name prove one bond covers drainage and utilities?

No. It is the catalog description. Have PDS identify the actual combined or separate instruments and covered work.

Is this automatically a drainage warranty bond?

No. The county separately describes erosion-control, warranty and maintenance security stages. Their calculations and periods do not establish this performance offering's terms.

Can I use the ROW Utility offering instead?

It is separately listed. Confirm each instrument's scope and county acceptance before treating the offerings as equivalents.

Does a D8 application authorize construction?

No. Complete the applicable reviews, arrange accepted security and obtain the county permit before relying on authorization.