Skip to content

Washington bonds

Vancouver, WA — Street Excavation Bond

For an excavation in Vancouver's city ROW, identify the cut, utility or other installation and obtain Engineering Services' actual security request. Do not assume the Street Excavation offering replaces the separately listed ROW Permit Bond or authorizes work without the city permit.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Washington
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Helps a Vancouver excavation contractor match the proposed opening and restoration request to the required city instrument.

Who needs it
Contractors asked for street-excavation security for work affecting Vancouver streets or other city ROW.
Who it protects
The accepted excavation instrument defines the city undertaking and covered activity. Its exact current form and match to this offering remain factual-check-pending.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Describe the opening and proposed restoration

Bring the street location, cut dimensions, utility connection or repair, surface affected and proposed schedule. Vancouver's ROW request asks for a detailed description such as a manhole connection or trenchless/boring work, the work location and a sketch/site plan.

Have Engineering identify the permit and security for the actual method. The form says trenchless and CIPP repairs need prior approval; avoiding an open cut does not itself establish that review or security is unnecessary.

Check contractor authorization separately

The current Engineering Services page says contractors must be on the authorized list to obtain a ROW permit for cutting into or changing the street/ROW. Confirm list status and the related building or ENG project before relying on permit readiness.

The separate Street Use process covers other kinds of occupation. A street-use approval, general contractor registration or purchased surety document should not be treated as the excavation permit.

Resolve the named instrument before applying

Ask for the current Street Excavation form, legal principal, recipients, amount, dates and restoration/acceptance requirements. Have the city/provider explain whether it is distinct from the separately offered ROW Permit Bond; equivalence is not established by the shared locality.

This page retains the existing Propeller Street Excavation application. Confirm its exact form match before ordering, then file the executed security as directed and obtain the actual permit before excavation. Ask about inspections, continuation and release rather than assuming a fixed warranty period.

Sources

Have these ready

  1. Identify the excavation location, method, dimensions, surfaces and work schedule.
  2. Confirm Vancouver authorized-contractor status and applicable ROW/ENG review.
  3. Get the specific excavation form and distinguish the separate ROW Permit offering.
  4. Confirm amount/dates, provider match, city acceptance, permit and inspection/release instructions.

Questions about this bond

Does trenchless work avoid city review?

Not automatically. Vancouver's request form specifically calls for prior trenchless/CIPP approval and the applicable site-plan information.

Is authorized-contractor status the excavation permit?

No. The city requires that status to obtain the ROW permit, but the actual project still needs its applicable review and authorization.

Can the ROW Permit offering substitute for this one?

Do not assume so. These are separately named options. Match the city's actual instrument and covered activity with the provider.

Is a fixed restoration period verified?

No exact excavation instrument or period was established by the permit pages. Obtain the city's accepted form and closeout conditions.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us