Waltham, MA — Street Permit Bond

Waltham's approved-contractor instructions require a $5,000 Street Opening Bond and separate Public Works permission before work. Its three-year trench-repair responsibility runs from the permit date; that duty is not a fixed three-year term supplied on this option.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Massachusetts
Bond type
Right-of-Way / Street Work / Encroachment Bond
Category
Contractors & construction

What this bond does

City of Waltham street-opening security for the actual approved contractor/permittee's covered work and restoration.

Who needs it
The City-required legal contractor/principal, with the property owner's project and approved-list application correctly identified.
Who it protects
The City's accepted instrument secures defined street work/restoration duties. Separate insurance and the contractor's trench-repair responsibilities are not unlimited surety protection for every private utility/building contract.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Prepare the approved-contractor and work details

The City's instructions, printed March 4, 2026, require two municipal-letterhead recommendations documenting satisfactory sewer, water and drain work. Confirm approved-contractor status and the actual legal permittee before naming the bond principal; the owner's address alone does not identify that party.

They call for the $5,000 Street Opening Bond, current separate insurance and a Public Works permit before starting. Allow the stated forty-eight-hour permit-approval waiting period; it is not an issuer turnaround promise.

File accepted security and plan inspections

Purchase Now opens Propeller; the option displays no fixed amount or term. Match the City's actual form/recipient/principal, required sum, permit/work coverage and dates with the issuer. Arrange required execution and ask Public Works for accepted delivery alongside the permit documents.

Obtain issued permission and valid Dig Safe information before excavation. The current instructions require advance inspection coordination and prohibit backfill/utility pipe work before City inspection approval; follow the actual inspector's directions.

The contractor accepts trench repair/re-paving responsibility for settlement or deterioration for three years from the permit date. Keep that date and inspection/restoration records and obtain actual security continuation/release. Neither finishing the cut nor an assumed annual anniversary establishes discharge.

Sources

Have these ready

  1. Actual Waltham work/site, approved contractor and legal permittee/principal; municipal recommendations as required.
  2. City-accepted form/recipient, assigned sum/permit coverage/dates and issuer execution/filing.
  3. Issued work permission, current separate insurance, Dig Safe and inspection scheduling before covered work/backfill.
  4. Permit-date trench-repair duty, inspection/restoration records and actual continuation/release.

Questions about this bond

Is three years the offered bond term?

The City states a contractor trench-repair duty from the permit date. This option supplies no fixed term; match actual security dates and continuation.

Is the forty-eight-hour wait a bond promise?

It concerns City permit approval. Complete issuer processing, accepted filing and actual work permission separately.

Can the trench be backfilled before inspection approval?

The current City instructions prohibit backfill/utility pipe work until City Inspector approval. Arrange the required inspection in advance.