Warren, MI — Excavation Permit/Right Of Way Bond

Use Warren Engineering's excavation/opening bond with the actual work address and permit holder. Its currently selected requirements assign $5,000–$50,000 for local-road ROW and $50,000–$3 million for a major thoroughfare after plan review. These are City assignment ranges, not fixed attributes of the listed option.

Also known as Warren License & Permit Bonds

Continue to our secure checkout partner, RLI (opens in a new tab).

Recorded state
Michigan
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

City of Warren, Macomb County, Michigan security accepted for the identified excavation/opening in or under a street or public place.

Who needs it
The actual applicant/permit holder arranging the City's assigned instrument for the addressed opening, coordinating its contractor and approved work plans.
Who it protects
The selected bond concerns damage to streets, sidewalks, unpaved areas and City utilities, with the instrument's stated City indemnity. It does not establish every private project's completion/payment security.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Match the opening and road class to the City form

The current Engineering index selects its ROW Surety Bond and a newer construction-requirements file. The selected bond identifies the applicant, City of Warren in Macomb County, penal sum, effective/date fields and address of the excavation or opening.

The selected requirements say the permit holder submits the Engineering Division form with the actual work address. Engineering sets the sum after plan review within the stated local-road versus major-thoroughfare ranges; do not automatically buy the lowest amount or use a general contractor-registration form.

The selected bond says one year from date hereof. Confirm the City's required dated execution/effectiveness and issuer's actual coverage before arranging it; this option supplies no fixed term, and checkout date does not establish the form's date.

Separate security from deposits, permission and restoration

Purchase Now opens RLI. The option displays no fixed amount. Match the City's accepted form, principal, address, assigned sum and dates with the issuer, arrange execution and accepted Engineering filing, and obtain the actual Engineering permit separately from Building approval.

The currently selected requirements separately call for permit-holder liability evidence and an inspection deposit. Coordinate the actual additional-insured parties and work address; neither the bond nor a refundable deposit replaces insurance. County/state/drain permissions remain separate where applicable.

Notify Engineering at least one business day before starting under the selected specifications, keep permit/approved plans on site and arrange actual inspections before covering work. Restore disturbed areas to pre-existing or better condition and keep actual acceptance/security-release instructions; completion or a deposit balance does not prove automatic surety release.

Sources

Have these ready

  1. Actual Warren opening address/work, road class and legal applicant/permit holder.
  2. Engineering's assigned sum and accepted City bond form with actual dated coverage.
  3. Approved plans, separate insurance/additional-insured evidence and inspection deposit.
  4. Issuer execution/filing, actual Engineering permit, start/inspection and restoration/release.

Questions about this bond

Can every excavation use $5,000?

No. Engineering assigns the sum after plan review. Its selected requirements distinguish $5,000–$50,000 local-road work from $50,000–$3 million major-thoroughfare work.

Does the form's year run from online purchase?

The selected form says one year from date hereof. Confirm the actual City-required dates and issued coverage; checkout does not set them.

Does a Building permit replace Engineering approval?

No. The selected requirements distinguish Engineering approval and call for it before Building issuance, with separate related agency permissions where applicable.