Warren Engineering's permit holder must submit the accepted City bond form with the actual work address. Its selected requirements distinguish local-road and major-thoroughfare amounts and separate surety, insurance and inspection deposit. Confirm the City's actual project assignment before using this ROW offering.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Michigan
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

City of Warren, Macomb County, Michigan security accepted for the particular Engineering ROW project and addressed permit.

Who needs it
The named Engineering permit holder for City ROW work, coordinating its actual contractor, design plans and other required authorities.
Who it protects
The accepted City instrument secures its stated public-place opening/damage obligations. Engineering project approval, other permits and a general contractor licence are separate matters.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Prepare the Engineering record before choosing the sum

The currently selected construction requirements cover City ROW, utility easements and specified private work, with Engineering approval distinct from Building. For new-building/addition review they call for complete site plans, including paper and electronic approved copies; use the actual project's plan checklist.

Engineering sets security after plan review: $5,000–$50,000 for local-road ROW and $50,000–$3 million for a major thoroughfare. The permit holder must submit the Division's form with the work address. Neither the source range nor this generic listing establishes a fixed supplied sum.

The currently selected bond describes excavation/opening at the stated address and says one year from date hereof. Confirm that this is the instrument assigned to your work, its actual principal/City recipient, sum and dated coverage; do not infer a blanket term for every project.

Arrange accepted security and the separate field requirements

Purchase Now opens Propeller. The option displays no fixed amount or term. Match Engineering's actual request with the issuer, arrange execution and accepted filing, and obtain the actual Engineering approval plus other required permissions before work.

The selected requirements separately identify permit-holder insurance with the work address and specified additional-insured parties, and a permit-holder inspection deposit. Confirm those actual records independently. State ROW, Macomb road/drain or utility approvals may also be required; a City surety does not issue them.

Give at least one business day's start notice under the selected specifications and keep the permit/approved plans on site. Arrange actual inspections, including special approval/scheduling for restricted days. Restore disturbed areas to pre-existing or better condition and obtain actual acceptance and security-release instructions; an inspection-deposit return is not a surety refund rule.

Sources

Have these ready

  1. Actual Warren Engineering project/work address, permit holder, contractor and road class.
  2. Approved paper/electronic plans and applicable other authority permissions.
  3. Engineering-assigned form/sum/dates, separate insurance/additional-insured record and inspection deposit.
  4. Issuer execution/accepted filing, actual permit, start/inspection schedule and restoration/release.

Questions about this bond

Who submits the City-addressed security?

The currently selected requirements specify the permit holder and the Engineering Division form containing the actual work address. Confirm the required legal principal.

Does the listed option supply a fixed amount or year?

No. Engineering assigns the sum after plan review. The selected form's one-year-from-date-hereof wording must be matched to actual accepted dates and issued coverage.

Does security replace an inspection deposit or related agency permit?

No. The selected requirements identify separate insurance/deposit and related authority approvals. Obtain the actual records and Engineering work permission.