Westwood, MA — Sidewalk Crossing Permit Bond

Tell Westwood Highway whether your work crosses an intact sidewalk or changes the sidewalk, curb cut or driveway apron. Its published highway instructions set $5,000 minimum bonds for street-opening and curb-cut permits, but do not identify a separate sidewalk-crossing bond form.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Massachusetts
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Town of Westwood, Massachusetts security for the actual sidewalk-crossing request, with the applicable permit and accepted instrument confirmed by Highway.

Who needs it
The applicant and excavator or contractor named in Westwood's request; owner signatures are also required for specified permit categories.
Who it protects
The accepted instrument concerns the specified public-way work and restoration. A street-opening or curb-cut requirement is not proof that every crossing uses that same bond or authorizes sidewalk alterations.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify the activity before choosing the instrument

Westwood's current Highway page directs driveway, street-opening and trench applications to its permit portal. The linked instructions distinguish opening/occupying a public way, trenching private property and a curb-cut driveway permit. Describe the crossing route, equipment and any proposed sidewalk or apron disturbance so Highway can identify the required permission.

The instructions list a $5,000 minimum bond for street-opening and curb-cut permits. Curb-cut work in the public way also needs street-opening permission and may need trench permission depending on depth. Have Highway confirm whether those requirements apply to the particular Sidewalk Crossing request and whether this surety form is acceptable.

Obtain the permit and keep the repair obligations

Purchase Now opens Propeller. The option displays no fixed amount or term. Match Highway's required form, applicant/recipient, assigned sum, coverage and dates with the issuer, arrange execution and accepted Town filing, and obtain the actual work approval. Do not treat portal submission or purchase as the permit.

The standard conditions call for advance Highway notice, like-material sidewalk restoration and final sidewalk repair within 30 days of completing work. They also state at least one year of trench maintenance, without establishing a bond term or release date for this crossing option.

If the work includes a driveway apron, the instructions require it to meet adjoining sidewalk grades and accessibility requirements. Check the assigned seasonal, traffic and inspection conditions with Highway; the source's specific driveway exception is not permission for every winter street opening.

Sources

Have these ready

  1. Westwood crossing location and route, equipment, duration and any sidewalk/curb/apron alteration.
  2. Highway determination of crossing, opening, curb-cut and applicable trench permissions.
  3. Actual applicant/excavator/owner signatures and accepted form, recipient, assigned amount, coverage and dates.
  4. Executed filing, Town approval, advance notices and sidewalk restoration/inspection/release directions.

Questions about this bond

Does every sidewalk crossing require the published $5,000 bond?

The instructions establish that minimum for street-opening and curb-cut permits. They do not identify a separate crossing instrument; ask Highway to assign the requirement for your activity.

Is a curb-cut permit enough for all driveway work?

The instructions also require street-opening permission for work in the public way and identify possible trench permission depending on depth. Obtain the permissions for the actual scope.

Is 30 days or one year the offered bond term?

Neither is a displayed term. Thirty days concerns final sidewalk repair after work, and at least one year concerns trench maintenance. Confirm the accepted crossing bond's dates and release separately.