Wood Dale, IL — Water, Sewer Or Demolition Contractor Bond

Wood Dale registers water, sewer and demolition contractors, but those labels do not establish one interchangeable bond. Its building-sewer code separately calls for a $5,000 indemnity bond on City-supplied forms before a sewer permit.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Illinois
Bond type
Contractor License / Registration Bond
Category
Contractors & construction

What this bond does

Match the actual City request to the water, sewer or demolition work rather than apply a sewer-specific requirement to all three trades.

Who needs it
Contractors with a written Wood Dale security request for the particular work and permit.
Who it protects
The building-sewer clause requires the installer to indemnify the City for loss or damage occasioned by installation. That specific obligation is not proof of a blanket private-project performance or payment guarantee.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Keep the building-sewer bond in its actual scope

Section 7.423(A)(10) says the licensed plumber or sewer contractor files a $5,000 indemnity bond with the City Clerk, using City-supplied forms and an Illinois-licensed corporate surety, before the building-sewer permit issues.

That clause does not by itself establish the accepted water-work or demolition instrument, sum or period. Do not assume a combined product label makes the same document suitable for every named activity.

Complete registration and the actual permit filing

The City's registration page includes these trades and calls for applicable credentials and insurance through its self-service registration process. That general checklist does not replace a separately requested permit bond.

Purchase Now opens Propeller in a new tab. Before applying, have the actual accepted form, legal principal, recipient, required sum and period. After issuance, verify and execute the document and provide it as the actual City request directs; the sewer clause specifically names the City Clerk.

Sources

Have these ready

  1. Identify water, sewer or demolition and the actual City request.
  2. Obtain the accepted form rather than transferring the sewer clause to all work.
  3. Prepare the principal, recipient, requested sum and dates.
  4. After issuance, check execution and complete registration and permit filing separately.

Questions about this bond

Does $5,000 apply to all water, sewer and demolition work?

The cited code clause is specifically for the building-sewer indemnity bond. It does not establish the other two trades' requirements.

Where does the building-sewer clause direct the bond?

It says to file the City-form indemnity bond with the City Clerk before the building-sewer permit issues.

Does contractor registration replace that permit security?

No. The general registration checklist and the specific permit bond serve separate steps. Match the actual request and form before applying.