Utilities
Excavation can strike gas, power or communication lines.
Try a different word, or check the spelling.
Installed conduit may remain your responsibility until a route section is accepted. Match project protection to that handover point, including partial acceptance and testing, rather than relying on the overall contract completion date.
Talk with The Southern Agency about your operation, policy terms, and the information carriers need.

You construct fiber routes through trenching, boring, and aerial placement. Damaging an existing utility line during construction or losing newly installed conduit to a storm can create significant project risks.
The Southern Agency can help review your construction methods and project assets to select appropriate insurance. We can discuss how to cover your mobile rigs, road vehicles, and unfinished network work as separate assets.
Excavation can strike gas, power or communication lines.
Trenches and moving equipment create injury hazards.
Rigs and splicers face theft or damage.
Installed materials remain exposed before handover.
Rights-of-way and acceptance duties affect responsibility.
Policies to ask about. Which ones fit depends on your operations, your contracts, and the carrier’s forms.
These hypothetical examples are not agency claim results. Whether a loss is covered depends on the facts, policy terms, and applicable exclusions.
A bore head strikes a gas line and a nearby business claims property damage and shutdown losses. General liability may address covered resulting injury or damage from accepted excavation. Locating responsibilities, utility restrictions and pure financial-loss exclusions still matter; an outage alone does not prove insured loss.
A trench wall collapses and injures a crew member. Workers compensation may provide covered medical and wage-loss benefits for an insured employee under applicable state terms. A subcontractor's crew requires separate employer and policy coordination; being on the same route does not establish the same insured status.
A storm damages placed conduit before the customer accepts that section of route. Builders risk or installation terms may address included physical damage if the declared works and cause fit. Check whether partial acceptance or testing already ended protection on that section; the overall contract completion date does not settle that question.
Start with the work you do and the questions your current policies leave unanswered. Carrier options depend on your location, risk, and underwriting. Explore our approach.
Describe boring, trenching and aerial work, route values, subcontractors and acceptance points. Compare accepted liability operations, worker status, vehicles, rigs and installation interests separately. A prime's insurance schedule or a contract bond does not establish that a utility strike or unfinished route is insured.
Accepted underground operations and resulting-damage terms matter; an outage alone may not be insured.
The actual prime or municipal contract determines whether a bond is required and what obligation it assures. Approval and terms need separate review. A bond does not substitute for insurance on crews, rigs or the route under construction.
Mobile-equipment schedules need correct values, uses, and perils.
Project coverage must fit installed work and actual acceptance, testing, and occupancy boundaries.
Use the particular prime or municipal terms rather than assume uniform limits.
Bring your questions, current policies, and relevant contracts. An agent can review coverage terms, exclusions, and the information carriers ask for, then explain the options available to you.